Key takeaways

  • Web design costs are made up of six items. Only two of them have to do with design.
  • Two quotes for the same project can differ by a factor of five without either being miscalculated.
  • The hourly rate says little. What matters is how many hours are calculated and for what.
  • If you want to lower the price, reduce page types and special features, not the quality of the build.

What the price is made up of

Web design is often thought of as one item: "the website". In fact, there are six, and they behave very differently.

1. Concept and structure. Clarifying goals, developing the sitemap, assigning search terms. 8 to 15 percent of the total. The item that gets cut most often and is the most expensive to make up for later.

2. Design. Designs for the different page types, feedback rounds, design grid. 25 to 35 percent.

3. Build. Building the pages, mobile adaptation, content management, testing. 30 to 40 percent.

4. Content. Copy, image selection, image editing. 0 to 40 percent, the biggest variation in the entire project.

5. Technology and migration. Redirects, data transfer, interfaces. 5 to 20 percent.

6. Launch and onboarding. Testing, handover, training. 5 to 10 percent.

If you compare two quotes, break them down into these six items. It almost always turns out that one of them is missing an entire item.

The question that makes quotes comparable

Web design is often thought of as one item: "the website". In fact, there are six, and they behave very differently.

1. Concept and structure. Clarifying goals, developing the sitemap, assigning search terms. 8 to 15 percent of the total. The item that gets cut most often and is the most expensive to make up for later.

2. Design. Designs for the different page types, feedback rounds, design grid. 25 to 35 percent.

3. Build. Building the pages, mobile adaptation, content management, testing. 30 to 40 percent.

4. Content. Copy, image selection, image editing. 0 to 40 percent, the biggest variation in the entire project.

5. Technology and migration. Redirects, data transfer, interfaces. 5 to 20 percent.

6. Launch and onboarding. Testing, handover, training. 5 to 10 percent.

If you compare two quotes, break them down into these six items. It almost always turns out that one of them is missing an entire item.

Why the same job costs 4,000 or 25,000 euros

An example that comes up all the time in practice. A company gets three quotes for "a new website with ten pages" and receives 4,200, 11,800 and 24,500 euros.

All three are correctly calculated. They just describe three different projects:

4,200 euros: A purchased template is adapted. Content comes entirely from the client, including images. No concept, no structure, no search engine work. Two rounds of corrections.

11,800 euros: Custom design for three page types, content from the client with polishing, search engine basics, redirects. The solid middle ground.

24,500 euros: Concept phase with goal definition and keyword research, custom design for six page types, eight pages of copy from the agency, migration of a blog, team onboarding.

The difference is not in the quality of the craftspeople, but in the scope of services. And this scope is rarely stated so clearly in the quote that you can spot it when skimming.

The hourly rate is the wrong question

Almost every comparison starts with the hourly rate. That is understandable and still misleading.

An agency charging 140 euros per hour that needs three hours for a service page is cheaper than one charging 80 euros that needs eight hours. The hourly rate describes the price per unit of time, not the price per result.

Two other numbers are more meaningful: how many hours are calculated in total and how they are distributed across the six items. A quote that puts 60 percent of the hours into the build and nothing into the concept will deliver a different result than one that invests 20 percent up front.

Realistic hourly rates in Germany in 2026: freelancers 60 to 110 euros. Small and medium-sized agencies 90 to 160 euros. Network agencies 150 to 250 euros. Significantly lower almost always means outsourcing or little experience.

What drives the price up

Four things make a web project disproportionately more expensive. If you know them, you can decide early whether they are worth the money.

Unclear requirements. The most expensive factor of all. If pages are added, structures change or new decision-makers show up during the project, you get repeated loops. Every rework costs more than the original work.

Too many decision-makers. Feedback from five people with different ideas creates coordination rounds nobody calculated. One person with decision-making authority saves more money than any negotiation over the hourly rate.

Special features. Configurators, calculators, filters, bookings, customer areas. Each of these features is its own small software project with its own testing phase.

Late content. If copy only arrives after the design, the design gets done twice. That is the most common avoidable extra effort in the entire course of a project.

Where it makes sense to save and where it doesn't

Smart savings:

On the number of page types. If you build five patterns instead of eight, you save a considerable part of design and build without the website being able to do less.

On the copy. Write subject-matter content internally and only have it structured and sharpened externally. That is usually the best combination of cost and result.

On features that fit into phase two. Blog section, careers page, a second language: all of these can be added later if the structure is set up for them from the start.

Don't save:

On the concept phase. This is the item with the biggest leverage and the smallest share of the total. If you cut here, you build a website nobody finds.

On the redirects. In a relaunch, this is the point where you lose rankings that were built up over years. The savings are in the hundreds, the damage in the tens of thousands.

On the mobile build. Most visitors come on mobile. A site that has problems there makes every other investment ineffective.

A sample calculation to check for yourself

Service company, 25 employees, twelve pages, four page types, half of the content external.

ItemHoursRateTotal
Concept and structure14€120€1,680
Design, 4 page types38€120€4,560
Build, 12 pages46€110€5,060
Copy, 6 pages24€110€2,640
Redirects and migration9€110€990
Testing, launch, onboarding11€110€1,210
Total142
€16,140

This is a typical mid-range calculation. It shows two things: design makes up just under 30 percent, not half. And 142 hours is around four weeks of full-time work, spread over three to four months of project time.

If you get a quote that estimates 40 hours for the same project, ask which items are missing from it.